Project Description

Working for main contractor Create Construction we will do the SFS, Drylining and install Aluminium windows at Primus Place, a development of high-quality student apartments in Leicester.

With the contract awarded in November 2014 we will be on site with our team of up to 20 in December 2014 to start a job which should take c30 weeks.

The apartments are larger-than-average and will be built to a very high spec in order to attract investors and discerning international student and post-graduate tenants.

Featuring mainly studios and with some two-bedroom apartments, Primus Place is another high-quality development designed to tempt investors looking for a strong return. As such, the build standards are very high and we’re delighted to be chosen as part of the team to achieve this.